Projects &
Activities
Sponsored Research Projects (External Funded)
List of Sponsored R&D Projects
|
S.N.
|
Project Title
|
Amount in Rs (Lakh)
|
Role (PI/CO- PI)
|
No. of CO-
PIs
|
Funding Agency
|
Sanctioned Date
|
Status (Completed/Ongoing)
|
|
1
|
CBM RESOURCE ESTIMATION AND FEASIBILITY STUDY OF FIELD DEVELOPMENT USING FULLY- INTEGRATED GEOCELLULAR MODEL APPROACH COUPLED WITH AI/ML ALGORITHMS IN
|
12.965
|
PI
|
1
|
DIRECTORATE GENERAL OF HYDROCARBONS (DGH)
|
20-09-2022
|
Ongoing
|
|
2
|
DEVELOPMENT OF INTEGRATED GEOCELLULAR MODEL FOR CBM RESOURCE ESTIMATION WITH THE SUPPORT OF MACHINE LEARNING BASED SUB-SURFACE IMAGE RESOLUTION ENHANC
|
12.903
|
CO-PI
|
1
|
DIRECTORATE GENERAL OF HYDROCARBONS (DGH)
|
20-09-2022
|
Ongoing
|
|
3
|
METHANE DRAINAGE PRIOR TO MINING
|
300.116
|
CO-PI
|
3
|
SCIENCE AND ENGINEERING RESEARCH BOARD
|
12-06-2018
|
Ongoing
|
|
4
|
DEVELOPMENT OF CUSTOMIZED PROCESSING SEQUENCES OF EXPLORATION SEISMIC DATA IN THE DAMODAR RIVER VALLEY BASIN TO DETECT COAL SEAMS- BASED RESERVOIR TOW
|
5.906
|
CO-PI
|
1
|
ESSAR OIL AND GAS EXPLORATION AND PRODUCTION LIMITED
|
06-07-2023
|
Ongoing
|
|
5
|
RESERVOIR CHARACTERIZATION OF RANIGANJ CBM FIELD THROUGH PRESSURE TRANSIENT ANALYSIS (PTA)
|
6.71
|
PI
|
1
|
ESSAR OIL AND GAS EXPLORATION AND PRODUCTION LIMITED (EOGEPL)
|
06-04-2024
|
Ongoing
|
Consultancy Project
List of Industrial Consultancy Projects (Executed by Rajeev Upadhyay):
|
Title
|
Duration (Date)
|
Funding agency
|
Amount
|
Role
|
|
From
|
To
|
|
Detailed Subsurface Study for Reservoir Performance Evaluation of Eight (08) Wells of Mehsana and Ahmedabad Asset
(CONS 7379 C)
|
28-11-2024
|
28-02-2025
|
ONGC
|
Rs. 30,77,076/=
|
PI
|
|
Subsurface Reservoir Siulation & Modelling Studies to support expansion of field development plan of Raniganj CBM Blocks of Essar Oil and Gas Exploration and Production Limited (EOGEPL)
(CONS/7241/2024-2025)
|
16-05-2024
|
Ongoing
|
Essar Oil and Gas Exploration and Production Limited (EOGEPL)
|
Rs. 25,41,539/=
|
PI
|
|
Pre-Feasibility Study, CBM Resource Estimation and Ranking of CBM Blocks offered Under Special CBM Round 2022 for Oil India Limited
(CONS/7052/2022-2)
|
19-12-2022
|
07-03-2023
|
Oil India Limited
|
Rs. 27,23,000/=
|
PI
|
|
Prospectivity Analysis and Resource Estimation of CBM Block SP-ONHP (CBM)-2021/1 For Invenire Petrodyne Energy
(CONS/7051/2022-2023)
|
07-12-2022
|
05-02-2023
|
Invenire Petrodyne Limited
|
Rs. 10,90,000/=
|
PI
|
|
Field scale reservoir simulation study of Raniganj CBM field of Essar Oil & Gas Exploration and Production Ltd. (EOGEPL)
(CONS/6054/2021-2022)
|
02-04-2021
|
04-11-2022
|
Essar Oil and Gas Exploration and Production Limited (EOGEPL)
|
Rs. 20,76,923/-
|
PI
|
|
(Field-scale simulation study and production forecasting for a part of Sohagpur West CBM Block of Reliance Industries Limited (RIL)) Consultancy Project No. – CONS/5035/2019-2020
|
10/06/2019
|
17/02/2020
|
RIL
|
Rs. 28,02,946/=
|
PI
|
|
Generation of Production Profile for Deviated Wells for Raniganj field of ONGC CBM Project.
CONS/3908/2017-2018
|
05/11/2017
|
19/12/2017
|
ONGC
|
Rs. 3,49,343/-
|
PI
|
|
Generation of gas production profile in Raniganj CBM Block considering a combination of vertical and deviated wells.
Consultancy Project No. – CONS/3721/2017-18
|
15/7/2017
|
05/09/2017
|
ONGC
|
Rs. 3, 88,986/=
|
PI
|
|
Static Modeling, GIIP Estimation and Production Forecast of North Karanpura CBM Block.
Consultancy Project No. – CONS/3609/2017-18
|
1/05/2017
|
31/07/2017
|
ONGC-PEPL-IOCL Joint Venture (JV)
|
Rs. 9, 66,531/=.
|
PI
|
|
Generation of gas production profile in Raniganj CBM Block considering a combination of vertical and deviated wells.
Consultancy Project No. – CONS/3721/2017-18
|
15/7/2017
|
05/09/2017
|
ONGC
|
Rs. 3, 88,986/=
|
PI
|
|
Supervising The Injection/Fall-Off Tests and Performing Pressure Transient Analysis in Five Core Holes of Jharia CBM Block of Prabha Energy Private Limited
(CONS/7259/2024-2025)
|
21/10/2024
|
Ongoing
|
Prabha Energy Pvt. Ltd
|
Rs. 9,44,000/=
|
Co-PI
|
|
Detailed Study on Hydraulically Actuated Artificial Lift (HAAL) Unit Vis-a- Vis Conventional SRP Unit
(CONS/7216/2023-2024)
|
27-12-2023
|
27-02-2024
|
ONGC
|
Rs. 27,70,000/=
|
Co-PI
|
|
Pressure Transient Analysis of Wells of Raniganj CBM Field For Mining Associates (CONS/7219/2023-2024)
|
04-10-2023
|
22-03-2024
|
Mining Associates Private Limited, Asansol
|
Rs. 3,27,000/=
|
Co-PI
|
|
“Map Based Conceptual Subsurface Model of CBM block SR-ONHP(CBM)-2021/6” for Cairn Oil & Gas
(CONST090C)
|
15-10-2024
|
15-11-2024
|
Cairn Oil & Gas (Vedanta Ltd.)
|
Rs. 5,60,000/=
|
Co-PI
|
|
Grand Total
|
|
|
|
Rs. 2,10,06,300/=
(Rs. 2.10 Crores)
|
|
Innovation and Product Development
BHARATCBM: The First Indian-Made, User-Friendly, and Affordable CBM Reservoir Simulation Software with a Novel Semi-Analytical Approach. Coalbed methane (CBM) projects are generally marginal economics business. Commercially existing simulators like ECLIPSE/CMG/COMET etc. come with huge cost implications for CBM operators. In this regard, availability of indigenous simulator BHARATCBM will help CBM operators by reducing software cost up to 80% compared to commercially available numerical simulators without compromising accuracy. The indigenously developed software is being tested and used in the production performance evaluation of producing CBM wells of Raniganj CBM block operated by Reliance Industries Limited (RIL) and Essar Oil and Gas Production Pvt. Ltd. (EOGEPL). The process of commercialization will follow after demonstration and testing.
Details of Intellectual Properties (IP) (Patents, Copyrights etc.):
BHARATCBM: The First Indian-Made, User-Friendly, and Affordable CBM Reservoir Simulation Software With A Novel Semi-Analytical Approach. PATENT is submitted.
Membership of Scientific Societies
Other Academic and Administrative Activities
- Administrative Responsibilities
- Head, Centre for Earth, Energy, and Environmental Research (CEEER) – May 2020 to till date
- Played a pivotal role in defining the vision and mission of the Centre.
- Prepared the detailed document for the centre listing vision, mission, key focus areas of R&D, budget requirements etc.
- Generated funds for the centre through consultancy projects (Current account balance of the centre is more than Rs. 30 lakhs/-)
- Associate Dean (Alumni Affairs) – Sept. 2018 to Oct. 2023
- Consolidated database of ISM alumni created which contains updated information on more than 20000 Alumni across the world.
- Worked extensively on strengthening the relationship of IIT(ISM) with all Alumni Association chapters
- For the first time, a donation to the tune of Rs. 8 crores received from alumni (Mr. Naresh Vashishth) for setting up “Tinkering and Innovation Lab”; Moreover, coordinated with alumni and facilitated the generation of fund to the tune of Rs. 2.2 Crores for establishment of smart classrooms and studio
- Conceptualized and created Student Alumni International Relations Cell (SAIRC) with a goal of encouraging students participation in Alumni Affairs activities