Designation: Assistant Professor
Department: Mining Engineering
Email: arkajyoti[at]iitism[dot]ac[dot]in
Contact Number: 0000000000
Office Number: +91-326-223-5413
Personal Page: Click Here
About Me: I am an Assistant Professor in the Department of Mining Engineering at IIT (ISM) Dhanbad, with over 12 years of prior experience as a Scientist at CSIR–Central Institute of Mining and Fuel Research (CIMFR), Dhanbad. During my tenure at CIMFR, I was actively involved in 7 R&D projects and more than 70 industry-funded projects, contributing extensively to applied research and technology/know-how development for the mining sector. I also gained valuable field exposure as a Management Trainee (Mining) at Coal India Limited, where I worked in highly mechanized underground operations, including continuous miner operations and longwall mining at Jhanjra Projects Colliery, ECL. I received my B.E. in Mining Engineering from IIEST Shibpur (2011), M.Tech. in Mine Safety Engineering from AcSIR (2014), and Ph.D. from IIT(ISM), Dhanbad (2022). I secured 1st rank in B.E. and All India Rank 1 in GATE (Mining) in 2012. My research interests include underground coal and metal mining methods, rock mechanics, numerical simulation, ground control, and mine instrumentation and monitoring. I have published over 50 research papers in reputed national and international journals and conferences, authored 1 book, hold 1 granted patent, and have filed 1 patent and 1 copyright. My work has been recognized through several awards, including the Young Associate Award 2024 by the Indian National Academy of Engineering (INAE), the Young Engineer Award 2022 by the Institution of Engineers (India), and the IMTR Award 2020 by IIT (ISM) Dhanbad.
Research Interest: Underground Coal Mining Methods for Mechanized and Semi-mechanised Operations; Highwall Mining and Punch Entry Mining; Underground Metal Mining Methods including Underhand Longhole Open stoping with Pastefill; Design of Mine Access like Portals, Inclines, and Shafts; Design of Open Pit Slope and Overburden Dump; Rock Mechanics & Computational Geomechanics; Numerical Simulations for stability analysis; Stochastic Design of Underground and Openpit Mine; Rock Mass Characterization, Ground Control, Support Design and Subsidence Engineering; Geotechnical Instrumentation and Monitoring
|
Degree |
Discipline |
Institute |
Year |
Marks |
|
Ph.D. |
Mining Engineering |
Indian Institute of Technology (Indian School of Mines), Dhanbad |
2022 |
NA |
|
M.Tech. |
Mine Safety Engineering |
Academy of Scientific and Innovative Research (AcSIR), New Delhi |
2014 |
9.61 out of 10 (Distinction) |
|
B.E. |
Mining Engineering |
Bengal Engineering and Science University (Presently, IIEST) Shibpur |
2011 |
81.66% (Hons.)
|
|
12th |
Science |
Ramakrishna Mission Vivekananda Vidyamandir, Malda (West Bengal Council of Higher Secondary Education) |
2007 |
87.8% (Best of Five) |
|
10th |
|
Ramakrishna Mission Vivekananda Vidyamandir, Malda (West Bengal Board of Secondary Education) |
2005 |
89.62% |
|
Sl. No. |
Post |
Organisation |
Pay Scale |
Duration From |
Duration To |
|
1. |
Assistant Professor (Grade-I) |
Indian Institute of Technology (Indian School of Mines) Dhanbad |
Pay Band Rs. 37400-67000/-(PB-4, GP-8700/-) Level 13 (7th CPC) |
11-12-2025 |
Continued |
|
2. |
Principal Scientist |
CSIR-Central Institute of Mining and Fuel Research, Dhanbad |
Pay Band Rs. 37400-67000/-(PB-4, GP-8700/-) Level 13 (7th CPC) |
12-04-2024 |
10-12-2025 |
|
3. |
Senior Scientist |
CSIR-Central Institute of Mining and Fuel Research, Dhanbad |
Pay Band Rs. 15600-39100/-(PB-3, GP-7600/-) Level 12 (7th CPC) |
12-04-2020 |
11-04-2024 |
|
4. |
Scientist |
CSIR-Central Institute of Mining and Fuel Research, Dhanbad |
Pay Band Rs. 15600-39100/-(PB-3, GP-6600/-) Level 11 (7th CPC) |
11-04-2016 |
11-04-2020 |
|
5. |
Research Scholar |
Indian Institute of Technology, Kharagpur |
Rs. 25000/- (Consolidated) |
29-12-2014 |
01-04-2016 |
|
6. |
Trainee Scientist |
CSIR-Central Institute of Mining and Fuel Research, Dhanbad |
Rs. 34650/- (Consolidated) |
05-09-2012 |
04-09-2014 |
|
7. |
Management Trainee |
Coal India Limited |
Pay Band Rs. 16,400-40,500/- |
03-08-2011 |
06-07-2012 |
Young Associate Award 2024 by the Indian National Academy of Engineering (INAE).
Young Engineer Award 2022 by the Institution of Engineers (India).
Inder Mohan Thapar Research (IMTR) Award by Indian Institute of Technology (Indian School of Mines) Dhanbad in recognition of excellence in research publication based on Impact factor of the scopus/SCI indexed journals during the calendar year 2020.
Selected as an Empanelled Evaluator and Advisor for TEXMiN, IIT(ISM) Dhanbad.
1st prize of Dr. K. N. Sinha Award, 2020 by CSIR-CIMFR CSIR-CIMFR for highest impact factor of papers published in SCI journals.
3rd prize for best poster at the International Conference and Exhibition on Energy & Environment: Challenges & Opportunities, 2019.
Trainee Scientist fellowship from CSIR, Govt. of India.
All India Rank 1st in GATE (Mining), 2012.
Institutes’ Medal for securing 1st rank in 2011 Batch of Mining Engineering, IIEST, Shibpur.
MGMI Shivlal Gold Medal for excellent performance at graduation level.
Invited as a resource person by HRD, BCCL for imparting training on "FUNCTIONAL SKILL PROGRAM FOR MINING" to the employees of Bharat Coking Coal Limited (BCCL).
Member of the Mining Engineering Division Board of the Institution of Engineers (India).
MHRD Fellowship 2014, for pursuing Ph.D. at IIT, Kharagpur, by Govt. of India.
List of Papers Published in SCI Journals (Q1: 14, Q2: 1, Q3: 3)
Govt. Funded Projects at IIT(ISM), Dhanbad
|
Sl. No. |
Title of Project |
Funding Agency |
Project Cost in INR (Lakh) |
Role |
|
1. |
Development of Innovative Extraction Method for Safer Extraction of Coal Seam by Underground Method with Higher Productivity and Percentage of Extraction using Continuous Mining System |
CIL R&D Board |
131.37 |
Project Investigator |
Govt. Funded Projects at CSIR-CIMFR
|
Sl. No. |
Title of Project |
Funding Agency |
Project Cost in INR (Lakh) |
Role |
|
1. |
Design of underground coal pillars by stochastic approach considering randomness and spatial variation of rock mass strength |
SERB, Govt. of India |
30.25 |
Project Investigator |
|
2. |
Development of tandem approach for paste fill technology and extraction methodology by Continuous Miner (CM) for Shampur B Colliery Mugma Area, ECL |
Coal India Limited R&D Board |
130.0 |
Project Leader |
|
3. |
Roof rock reinforcement system (R3S) for mine roadways intersection under varying geomining conditions as FBR under 4M theme of CSIR |
CSIR, India |
122.72 |
Co-Project Investigator |
|
4. |
Design and stability of pillars/array of pillars for different mining methods in coal mine workings |
Coal India Limited R&D Board |
253.71 |
Member |
|
5. |
Development of empirical methodology for design of crown pillar during transition from opencast to underground mining for Indian mines |
Ministry of Mines, Govt. of India |
37.89 |
Member |
|
6. |
Development of digital mine using Internet of Things (IoT) |
Ministry of Electronics and Information Technology, Govt. of India |
222.30 |
Member |
|
7. |
Development of a technology for optimal extraction of locked-up coal from underground mines using artificial pillars acronym as DeCoalArt (A 12th Five Year Plan Network Project) |
CSIR, India |
1897.52
|
Member |
Industry Sponsored Projects at CSIR-CIMFR
|
Sl. No. |
Title of Project |
Funding Agency |
Project Cost in INR (Lakh) |
Role |
|
1. |
Instrumentation and strata monitoring during stoping operation at Rampura Agucha underground mine, HZL (SSP/761/2023-24) |
Hindustan Zinc Limited (HZL) |
44.84 |
Project Leader |
|
2. |
Strata monitoring of stopes, strata condition and rock mechanics study in Banwas block of Khetri mines of Hindustan Copper Limited of Banwas project of SMSL (SSP/736/2023-24) |
SMS Limited |
21.24 |
Project Leader
|
|
3. |
Strata monitoring of stopes, strata condition and rock mechanics study in Banwas block of Khetri mines of Hindustan Copper Limited of Banwas project of SMS Limited. (SSP/569/2021-22) |
SMS Limited |
23.60 |
Project Leader |
|
4. |
Instrumentation and strata monitoring during drivage of two inclines, interconnection and one inset in seam IV & III at Bicharpur underground coal mines, Shahdol, MP (SSP/341/2018-19) |
Gainwell Commosales Private Limited (GCPL) |
14.87 |
Project Leader |
|
5. |
Instrumentation plan and strata monitoring during extraction of pillars in the proposed CMP-11 panel [ subpanels CMP-11A(1), CMP-11A(2) and CMP-11A(3) using continuous miner technology at VK-7 Incline, Kothagudem area, SCCL (SSP/371/2019-20) |
Singareni Collieries Company Limited (SCCL) |
24.60 |
Project Leader |
|
6. |
Instrumentation and strata monitoring of low high continuous miner projects at Jhanjra 3&4 mine in seam RVII and RVIIA of Jhanjra project colliery, ECL (SSP/382/2018-19) |
Gainwell Commosales Private Limited (GCPL) |
25.96 |
Project Leader |
|
7. |
Instrumentation and strata monitoring during stoping at Rampura Agucha Underground Mine, HZL (SSP/428/2019-20) |
Hindustan Zinc Limited (HZL) |
41.30 |
Project Leader |
|
8. |
Instrumentation and strata monitoring of low height continuous miner projects at Jhanjra 3 & 4 mine in seam VII and VIIA of Jhanjra project colliery, ECL (SSP/282/2017-18) |
Gainwell Commosales Private Limited (GCPL) |
23.60 |
Project Leader |
|
9. |
Scientific study on strata monitoring of development workings in Salarjung seam at Shanthikhani Mine with Continuous miner technology, Mandamarri Area, SCCL (SSP/199/2017-18) |
Singareni Collieries Company Limited (SCCL) |
8.86 |
Project Leader |
|
10. |
Instrumentation plan and strata monitoring during extraction of pillars in the proposed CMP-10 panel [sub panels CMP-10A(1), CMP-10A(2), CMP-10A(3)] using Continuous miner technology at VK-7 Incline, Kothagudem area, SCCL. (SSP/234/2017-18) |
Singareni Collieries Company Limited (SCCL) |
24.78 |
Project Leader |
|
11. |
Instrumentation and strata monitoring of low height continuous miner projects at Jhanjra 3&4 mine in RVIIA and RVII seams of Jhanjra Project Colliery, ECL. (SSP/485/2020-21) |
Gainwell Commosales Private Limited (GCPL) |
28.56 |
Project Leader |
|
12. |
Instrumentation and strata monitoring of low height continuous miner project at Jhanjra 3&4 mine in seam RVII and RVIIA of Jhanjra project colliery, ECL. (SSP/561/2021-22) |
Gainwell Commosales Private Limited (GCPL) |
31.41 |
Project Leader |
|
13. |
Instrumentation and strata monitoring of continuous miner working during development/depillaring operation in RVI seam at MIC, Jhanjra Colliery, ECL. (SSP/461/2019-20) |
Gainwell Commosales Private Limited (GCPL) |
12.98 |
Member |
|
14. |
Instrumentation and strata monitoring of continuous miner working during development/depillaring operation in R-VI seam at Kumardih-B Mine, ECL (SSP/626/2021-22) |
Gainwell Commosales Private Limited (GCPL) |
15.22 |
Member |
|
15. |
Instrumentation and strata monitoring of Continuous miner working during development/depillaring operation at MIC, Jhanjra Project colliery, ECL (SSP/627/2021-22) |
Gainwell Commosales Private Limited (GCPL) |
15.70 |
Member |
|
16. |
Instrumentation and strata monitoring of continuous miner working during development/ depillaring operation at MIC, Jhanjra project colliery, ECL (SSP/549/2020-21) |
Gainwell Commosales Private Limited (GCPL) |
13.37 |
Member |
|
17. |
Instrumentation and strata monitoring during drivage of two inclines, interconnections and one inset in seam IV and III at Bicharpur underground coal mine, Shahdol, MP (SSP/510/2020-21) |
Gainwell Commosales Private Limited (GCPL) |
10.90 |
Member |
|
18. |
Monitoring of strata behaviour during development of LCCM at Rani Atari underground mine Chirimiri Area, SECL (SSP/190/2017-18) |
South Eastern Coalfields Limited (SECL) |
9.13 |
Member |
Consultancy Projects at CSIR-CIMFR
|
Sl. No. |
Title of Project |
Funding Agency |
Project Cost in INR (Lakh) |
Role |
|
1. |
Advice on instrumentation and strata monitoring during stoping and review of underhand mining at Rampura Agucha underground mine, HZL (CNP/5213/ 2023-24) |
Hindustan Zinc Limited (HZL) |
23.83 |
Project Leader |
|
2. |
Advice for the stability of pillars and design of support system for trunk roadways and gate roadways in XV Seam at Moonidih Project, BCCL (CNP/5197/2023-24) |
INDU-SCCL-CORUM Consortum |
37.5 |
Project Leader |
|
3. |
Advice/feasibility study of the extraction of individual seams V, VI, and VII through highwall mining technology in designated panel -F in PCP-3 area of West Bokaro mine of M/S Tata Steel Ltd. (CNP/5108/2021-22) |
Tata Steel Limited |
12.15 |
Project Leader |
|
4. |
Advice for the introduction of highwall mining technology in RVIII Bottom seam and RVII Top seam at Narayankuri OCP of Mahabir (R) Colliery, Kunustoria Area, ECL. (CNP/5090/2021-22) |
Gainwell Commosales Private Limited (GCPL) |
16.52 |
Project Leader |
|
5. |
Advice on scientific study for feasibility of extraction of developed pillars in the proposed CMP-11 panel [consisting subpanels CMP-11A(1), CMP-11A(2), CMP-11A(3)] in King seam below caved goaf and barrier of Top seam by CM technology at VK-7 Incline, SCCL (CNP/4824/2019-20) |
Singareni Collieries Company Limited (SCCL) |
18.76 |
Project Leader |
|
6. |
Advice for strata monitoring instrumentation and preparation of instrumentation plan for K2 panel of R-V seam at Khottadih Colliery, ECL (CNP/4866/2019-20) |
Eastern Coalfields Limited (ECL) |
4.72 |
Project Leader |
|
7. |
Advice for Design of Extraction Methodology for Development and Depillaring Workings of King Seam at PVK-5 Incline Mine, SCCL for the Designated CM Project Area of Gainwell Commosales Private Limited (CNP/4873/2019-20) |
Gainwell Commosales Private Limited (GCPL) |
35.99 |
Project Leader |
|
8. |
Advice on feasibility of underground mining of marble with suitable cross-section of gallery opening and pillars at Zarivav Marble mine Ambaji Gujrat (CNP/4890/2019-20) |
D. K. Trivedi & Sons |
11.74 |
Project Leader |
|
9. |
Advice for preparation of Strata Control and Monitoring Plan (SCAMP) for the development of XI seam of Jamadoba Colliery, Tata Steel Limited (CNP/4894/2018-19) |
Tata Steel Limited |
6.78 |
Project Leader |
|
10. |
Advice for preparation of Strata Control and Monitoring Plan (SCAMP) for the development of VIII seam of 6&7 pits Bhutgoria Amalgamated Colliery, Tata Steel Limited (CNP/4908/2019-20) |
Tata Steel Limited |
6.78 |
Project Leader |
|
11. |
Advice for preparation of Strata Control and Monitoring Plan (SCAMP) for the depillaring of two panels at Jamadoba Colliery Tata Steel Limited (CNP/4912/2019-20) |
Tata Steel Limited |
15.93 |
Project Leader |
|
12. |
Advice for preparation of Strata Control and Monitoring Plan (SCAMP) for the depillaring of three panels at Bhelatand Amalgamated Colliery, Tata Steel Limited (CNP/4913/2019-20) |
Tata Steel Limited |
23.89 |
Project Leader |
|
13. |
Advice for preparation of Strata Control and Monitoring Plan (SCAMP) for the development of XII Seam of Bhelatand Amalgamated Colliery, Tata Steel Limited (CNP/4914/2019-20) |
Tata Steel Limited |
6.78 |
Project Leader |
|
14. |
Advice for preparation of Strata Control and Monitoring Plan (SCAMP) for depillaring one panel at Digwadih Colliery Tata Steel Limited (CNP/4915/2019-20) |
Tata Steel Limited |
7.96 |
Project Leader |
|
15. |
Advice for preparation of Strata Control and Monitoring Plan (SCAMP) for the development of VIII seam of Digwadih Colliery Tata Steel Limited (CNP/4916/2019-20) |
Tata Steel Limited |
6.78 |
Project Leader |
|
16. |
Advice for preparation of Strata Control and Monitoring Plan (SCAMP) for depillaring of one panel at 6&7 pits, Bhutgoria Amalgamated Colliery Tata Steel Limited (CNP/4917/2019-20) |
Tata Steel Limited |
7.96 |
Project Leader |
|
17. |
Advice on mining/geotechnical sequence during stoping at Rampura Agucha Underground Mine, HZL (CNP/4924/2019-20) |
Hindustan Zinc Limited (HZL) |
24.78 |
Project Leader |
|
18. |
Advice on study for depillaring of 124LW panel by Continuous Miner (CM) Technology in the East Block of Churcha Mine (RO), Baikunthpur Area, SECL (CNP/4928/2019-20) |
GMMCO |
23.60 |
Project Leader |
|
19. |
Advice for preparation of Strata Control and Monitoring Plan (SCAMP) for the development of one panel at Sijua Colliery, Tata Steel Limited (CNP/4936/2019-20) |
Tata Steel Limited |
6.78 |
Project Leader |
|
20. |
Advice on regional stability while extracting Longwall (14 to 17) block including sequence of extraction in XIV seam at Jitpur colliery of SAIL (CNP/4686/2018-19). |
Steel Authority of India Limited (SAIL) |
5.00 |
Project Leader |
|
21. |
Assessment of support requirement for development of RVII and RVIIA seam by LHCM at 3&4 incline of Jhanjra project colliery, ECL and recommendations thereof. (CNP/4719/2018-19) |
Gainwell Commosales Private Limited (GCPL) |
12.39 |
Project Leader |
|
22. |
Advice on scientific study for feasibility of extraction of dev. Pillars in the proposed CMP-10 panel [consisting sub panels CMP-10A(1), CMP-10A(2), CMP-10A(3)] in King seam below caved goaf and barrier of top seam by Continuous miner technology at VK7 Incline, Kothagudem area, SCCL. (CNP/4620/2017-18) |
Singareni Collieries Company Limited (SCCL) |
16.52 |
Project Leader |
|
23. |
Scientific study to assess and design of barrier against Pussai River to avoid chances of sliding down of barrier along interface with Gopinathpur Colliery, ECL. (CNP/4509/2016-17) |
Eastern Coalfields Limited (ECL) |
14.95 |
Project Leader |
|
24. |
Advice for design of extraction methodology for development and depillaring of Sector-F of R-VII and R-VIIA seams using Low Height Continuous miner at 3&4 Incline, Jhanjra Project Colliery, ECL (CNP/4996/2020-21) |
Gainwell Commosales Private Limited (GCPL) |
6.78 |
Project Leader |
|
25. |
Technical evaluation of safe and sustainable underground operation of Gare Palma IV/5 coal mine of M/s Hindalco Industries Limited, Raigarh (CG) (CNP/4987/2020-21) |
Hindalco Industries Limited |
5.31 |
Project Leader |
|
26. |
Advice for depillaring of 15 East Panel by Continuous Miner Technology in East block of Churcha Mine (RO), Baikunthpur Area, SECL (CNP/4978/20-21) |
GMMCO |
23.60 |
Project Leader |
|
27. |
Advice for the preparation and formulation of Strata Control and Monitoring Plan (SCAMP) as per Reg. 123 of CMR 2017 of Hirakund Bundia Mine, Orient Area, MCL. (CNP/4976/2020-21) |
Mahanadi Coalfields Limited (MCL) |
38.99 |
Project Leader |
|
28. |
Advice for method of depillaring operation for three panels B-15, B-16 and B-17 of RVI seam using continuous miner at Khottadih Colliery, ECL (CNP/5154/2022-23) |
CMTAPL |
23.6 |
Member |
|
29. |
Advice for the depillaring of 27L, East panel by SDLin the Seam-II (Khond Seam), Pandavpara Mine, SECL (CNP/5153/2022-23) |
SECL |
14.16 |
Member |
|
30. |
Advice for assessment of cavability and estimation of support resistance required for longwall mining in sector A of RVI seam at Jhanjra project colliery, ECL (CNP/5152/2022-23) |
CMSPL |
14.16 |
Member |
|
31. |
Advice on technical feasibility of change in direction for depillaring of B14B panel by deployment of Continuous Miner in RVI seam at Khottadih Colliery, ECL (TSP/0152/2022-23) |
CMTAPL |
2.54 |
Member |
|
32. |
Scientific study for development and depillaring of 95 LE panel with CM technology in the East Block of Churcha Mine (RO), Baikunthpur Area, SECL (CNP/5137/2022-23) |
GMMCO |
30.68 |
Member |
|
33. |
Advice on technical feasibility of change in direction for depillaring of B14 A panel by deployment of CM in RVI seam at Khottadih colliery, ECL (TSP/0142/2022-23) |
CMTAPL |
2.54 |
Member |
|
34. |
Scientific study for depillaring of 87LWest panel by continuous miner (CM) technology in the East Block of Churcha Mine (RO), Baikunthpur Area SECL (CNP/5111/2021-22) |
GMMCO |
25.96 |
Member |
|
35. |
Advice for depillaring of the 97L East panel by continuous Miner Technology in the East Block of Churcha Mine (RO), Baikunthpur Area, SECL (CNP/5019/2020-21) |
GMMCO |
23.60 |
Member |
|
36. |
Advice for the development/widening and heightening and depillaring by deployment of Continuous Miner in Seam I (Top) at Gayatri Underground Mine, SECL (CNP/5088/2021-22) |
Gainwell Commosales Private Limited (GCPL) |
34.81 |
Member |
|
37. |
Advice for the depillaring of 101L West panel by Continuous Miner Technology in the East Block of Churcha Mine (RO), Baikunthpur Area, SECL (CNP/5067/2021-22) |
GMMCO |
23.60 |
Member |
|
38. |
Advice on the feasibility of development and depillaring of RVI and RIV seams using Continuous Miner (CM) at Kumardihi "B" Mine ECL for the CM project of Gainwell Commosales Private Limited (CNP/5017/2020-21) |
Gainwell Commosales Private Limited (GCPL) |
55.46 |
Member |
|
39. |
Advice for the depillaring of 108L West panel by continuous miner technology in the East Block of Churcha mine (RO), Baikunthpur area, SECL (CNP/5045/2020-21) |
GMMCO |
23.60 |
Member |
|
40. |
Advice for the depillaring of 114L West Panel by Continuous Miner Technology in the East Block of Churcha Mine (RO), Baikunthpur Area, SECL (CNP/5014/2020-21) |
GMMCO |
23.60 |
Member |
|
41. |
Advice for preparation of Strata Control and Monitoring Plan (SCAMP) for the depillaring of two panels at Sijua Colliery, Tata Steel Limited (CNP/4935/2019-20) |
Tata Steel Limited |
15.93 |
Member |
|
42. |
Advice on strata monitoring data and establishment of cut-out distance in CM panel of Salarjung seam at Shantikhani Mine, Mandamari Area, SCCL (CNP/4553/2017-18) |
|
|
Sl. No. |
Name of the academic/professional bodies |
Type of membership |
|
1. |
International Society for Rock Mechanics and Rock Engineering (ISRM) |
Individual Member (Membership No.: 236/IND/2023-2032) |
|
2. |
Institution of Engineers (India) |
Associate Member (Membership No.: AM184367-5) |
|
3. |
Mining Engineers’ Association of India |
Life Member (Membership No.: 5158/DHN) |
|
4. |
Mining, Geological and Metallurgical Institute of India |
Life Member (Membership No.: LM 10928) |
|
5. |
Society for Mining, Metallurgy & Exploration |
Professional Member |